• Introduction and brief project scenario (suggested around 500 words) You may develop the scenario further from the project details given in Column 2 in Table 1.
Please discuss which project was chosen on the left side of the column
• Preliminary estimating method adopted in preparing the early stage construction cost estimate (suggested around 500 words) You are required to assume a suitable preliminary estimating technique for the chosen project scenario with justifications for your choice and describe how you used this method to prepare the early-stage construction cost estimate, with special emphasis on information availability and assumptions made at the time of preparing the estimate.
Discuss which estimating method was chosen and justify why this was chosen, also describe how this method was used in the early-stage construction cost estimate with emphasis on the availability and assumptions made at the time of preparing the estimate.
Estimating techniques: Function unit, superficial floor area, functional floor area : Below examples however please look into this
• Detailed analysis of the chosen factors that influenced on the accuracy of early stage construction cost estimate and caused the final construction cost of the project to vary significantly from it. (suggested around 1000 words including a brief conclusion)
Please discuss the influencing factors on the right side of the table which caused the discrepancy